The bathroom is a room with unique terms: high humidity, humidity differences. That’s why making fixes in the restroom, you should clearly plan the entire operating process, to think about the sequence of steps to be performed. In this article, you will find out the way to begin the repair in the bathroom and what sorts of work ought to be performed together with your own hands. Step-by-step instructions for bathroom repair
Phase 1: drawing up a strategy and selecting a design solution.
Repair in the toilet can be of two types:
- Unplanned, spontaneous, originating from the can of unforeseen circumstances. As an example, in case of an pipe burst, flooding by vsyakuhnya.ru neighbors.
- Planned, which is either capital or cosmetic. It requires preparation, serious fiscal investment and time.
Begin repairs in the toilet is to determine the design, inside. Think through to the last detail, what will be the room, select a color. Pastel colors are conventional, in addition to a blend of blue and blue, pink or peach with beige.
Begin repairs at the toilet is to ascertain the design, interior layout. Consider detail, what’s going to be the room, select a color. Pastel colors are thought to be traditional, as well as a mixture of colours.
Next point is that the option of facing substance. Usually, finishing in the bathroom is done with vinyl, porcelain tiles, mosaic, vinyl panels. Examine the pipes, if it needs to be mended. If needed, select the right alternative. Proceed to the measuring function: step all sides, figure out the area of the area. Based on these information, we mark the location of the plumbing fittings.
Measure 2: the choice of sanitary fixtures and material for completing.
It is very important to recognize that the purchase price of sanitary ware simplifies the preparation stage, rather than vice versa. This usually means that first we develop a design project, make a plan, then go to the store. Another point — you should specify how big your favourite plumbing fixtures and examine the plan, whether it matches.
It’s necessary to understand that the cost of plumbing fittings is completed by a planning stage, rather than vice versa. This means that first we create a new design project, create a plan, and then go to the store. Another one
As for materials for finishing, it is better to buy them instantly for the entire repair cycle, so that you will not be diverted if something has been missing. Remember about preparing the vital tools.
Step 3: dismantling tiling and plumbing.
After All of the preliminary work is completed, move on to the beginning of the task process:
- Remove the sink and bathtub from the room, even though they will not be replaced with new ones. In this manner, you can keep them clean and undamaged.
- Remove the tile, cleaning following it all surfaces: walls, ceiling, flooring.
- Remove old paint from the walls, if they had been previously painted, as the glue alternative or a new layer of paint won’t stick to the surface.
Step 4: Cost of communications: pipes, electric wiring.
Very often in an old home, you ought to carefully inspect and replace not just the pipes which are in the bathroom itself, but also the principal riser, and at times the interfloor plumbing. Why is it worth doing this? Old pipes anytime can give a flow, and then the new fix is going to be emptied, it is going to call for additional investment to eliminate defects.