Grizzly Reservoir, the useful content large-hill river over Aspen shaped of the damming Lincoln and Grizzly creeks, was drained 2nd june for fixes toward dam, canal and you may outlet really works.
Once springtime runoff next season, Dual Ponds Tank and you may Tunnel Organization will mark on the tank, so workers can also be developed a membrane layer across the material face regarding the newest dam, which had been built inside 1932, centered on a treatment.
The statement, by the RJH Professionals Inc. out-of Englewood, provided an inspection and analysis of the structure and you will demonstrated different choices for treatment. Half the cost of the analysis — $fifty,100 — was financed because of the Texas H2o Conservation Panel (CWCB).
The purpose of brand new treatment of one’s dam is to target dam safety concerns from the corroded and you will getting thinner upstream-mountain material against, uncontrolled seepage, and you can operational problems with the fresh retailer work, the fresh new declaration checks out. Читать далее